Wirral Docks Bridge
Year: 2017/2018
Client: Wirral CouncilDesigner: Ramboll
“A 350 tonne moving road bridge assembled and welded on site next to its intended installation location.
This replacement 2 carriageway road bridge is an execution Class III structure under EN1090-1 CE marking regs and complying with NHSSS20 and 19. The structure was also painted in location by MCL Group and completed in early 2018.