Cefni Bridge
Year: 2010
Client: Anglesey C.CDesigner: Datrus
The contract was awarded in November 2009 by Dawnus and by utilising our in-house 3D modelling and rendering software to produce all fabrication drawings in house.
Featuring curved trusses and stainless-steel railings a relatively complex but elegant structure. Handrail posts were laser-cut to required profiles and feature polished stainless-steel grab rails and high-tension intermediate cables. The design of the bridge allows us to transport it in sections, which are not only easier to handle but vastly reduce road- transportation costs, which may have otherwise been incurred.
Site Installation of bridge was carried out by D. Hughes Welding & Fabrication and Bob Francis Crane hire in February 2010. All works were completed in March 2010 on schedule.